Solving
XXL monopile installation challenges
DATE: September 24, 2024
SOLVING XXL MONOPILE INSTALLATION CHALLENGES
As the size of offshore wind turbines continues to grow, the challenges of XXL monopile installation are increasing. Traditional methods are reaching their limits, but the CAPE VLT is here to solve these challenges head-on.
In our latest video, we take you behind the scenes at the Moray West offshore wind farm, where the CAPE VLT is transforming the installation of massive monopiles with remarkable efficiency and precision.
Watch the video to see how we’re revolutionizing offshore wind installation and solving the key challenges of installing XXL monopiles.
WHY USE THE CAPE VLT
FOR XXL MONOPILE INSTALLATION?
FAST PILE HANDLING
SILENT PILE INSTALLATION
NO PILE DIAMETER LIMITATIONS
PILE DECOMMISSIONING POSSIBLE
vibro
lifting
technology
Discover how its unique features will uplift your next project; download the vibro lifting technology guide.