In 2018, the CAPE VLT-80 was used to upend and install four 726mm diameter through leg jacket piles with a length up to 87.5 meter, in a water depth of 32.5 meter.

Application details

Application

Pin pile installation

Pile type

Pin piles

PILE DETAILS

Pile type

Pin piles

Pile diameter

726mm

No. of piles

4

PROJECT DETAILS

Period

2018

Country

Mexico

Location

Bay of Campeche

Market

Oil & gas

System/end usage

Platform

Operator or end customer

Eni Mexicana

Installation contractor

Sapura Kenkana Mexicana

Main Reasons for solution choice

UPENDING, LIFTING, DRIVING IN SINGLE OPERATION

SUBSEA COMPATIBLE

CONTROLLED INSTALLATION

SELECTED EQUIPMENT

CAPE VLT-80

Equipment configuration

CAPE VLT-80 Single

Eccentric moment

80kgm

Max. line pull

131t

vibro
lifting
technology

Discover how its unique features will uplift your next project; download the vibro lifting technology guide.

YOU MIGHT BE
INTERESTED IN