4 PRE-PILED JACKET PILES WITH POSITIONING TEMPLATE
4 PRE-PILED JACKET PILES WITH POSITIONING TEMPLATE
In April – May 2023, CAPE Holland equipment was used to install four 84 inch pre-piled jacket piles. What makes this project special is that thanks to utilising the CAPE VLT, the pre-piling template did not need to support the piles and could therefore be a simple single layer positioning template.
The CAPE VLT-320 was used to upend the piles directly from a supply vessel and drove them straight through the positioning template on the seabed. Verticality was controlled by moving the CAPE VLT-320 with the crane hook whilst vibrating.
After having installed all four piles to the required depth, a hydraulic impact hammer (also supplied and operated by CAPE Holland) was used to drive the piles to final penetration.
Application details
PILE DETAILS
PROJECT DETAILS
Main Reasons for solution choice
CAPE VLT-320


vibro
lifting
technology

Discover how its unique features will uplift your next project; download the vibro lifting technology guide.