4 through leg pin piles for a wellhead platform

4 THROUGH LEG PIN PILES FOR A WELLHEAD PLATFORM

In 2018, the CAPE VLT-80 was used to upend and install four 1,829mm diameter through leg jacket piles with a length up to 87.5 meter, in a water depth of 32.5 meter.

Application details

Application
Pin pile installation
Pile type
Pin piles

PILE DETAILS

Pile type
Pin piles
Pile diameter
726mm
No. of piles
4

PROJECT DETAILS

Period
2018
Country
Mexico
Location
Bay of Campeche
Market
Oil & gas
System/end usage
Platform
Operator or end customer
Eni Mexicana
Installation contractor
Sapura Kenkana Mexicana

Main Reasons for solution choice

UPENDING, LIFTING, DRIVING IN SINGLE OPERATION

SUBSEA COMPATIBLE

CONTROLLED INSTALLATION

SELECTED EQUIPMENT

CAPE VLT-80

Equipment configuration
CAPE VLT-80 Single
Eccentric moment
80kgm
Max. line pull
131t

vibro
lifting
technology

Discover how its unique features will uplift your next project; download the vibro lifting technology guide.