4 pin piles for seabed structure June 10, 2019 In 2019, the CAPE VLT-80 was used to upend and install four 60 inch diameter pin piles with a length of 18 meter and weighing 22 tonnes.
6 anchor piles for FPSO Mooring system November 14, 2018 In 2018, the CAPE VLT-80 was used to upend and install six 60 inch diameter anchor piles with a length of 30 meter, in a waterdepth of 26 meter.
4 through leg pin piles for a wellhead platform October 17, 2018 In 2018, the CAPE VLT-80 was used to upend and install four 1,829mm diameter through leg jacket piles in a waterdepth of 32.5 meter.
Monopile installation on Amalia Offshore Wind Farm September 3, 2018 In 2018, the CAPE VLT-320 Tandem was used to upend and install a 4 meter diameter monopile with a slip joint at the Amalia Offshore Wind Farm.
Free hanging monopile installation test August 7, 2018 In 2018, the CAPE VLT-320 Tandem was used to upend and install a 6.5 meter diameter monopile at the Maasvlakte 2 in Rotterdam, the Netherlands.
4 tapered pin piles for jacket foundation November 14, 2017 In 2017, the CAPE VLT-320 was used to upend and install 4 pin piles with a length of 77 meters for a jacket foundation.
76 jetty piles for house boat mooring places October 25, 2017 In 2017, the CAPE VLT-80 was used to upend and install 74 piles with lengths varying between 18 and 23 meters for jetties for house boats.
Monopile installation for unmanned gas platform June 1, 2017 In 2017, the CAPE VLT-320 Triple was used to upend and install a 4.7 meter monopile in the Dutch sector of the North Sea for the NAM L13-FI platform.
11 tether piles December 14, 2016 In 2016, the CAPE VLT-80 was used to upend and install 11 tether piles, with a length of 28.5 meter in a water depth of 70 meter in the Caspian Sea.
Monopile decommissioning demonstration November 27, 2016 In 2016, the CAPE VLT-320 was used to decommission a monopile with a slip joint connection with a bottom diameter of 4 meter at the Maasvlakte 2.